บริษัท อิตัลไทยวิศวกรรม จำกัด นำโดย นายสกล เหล่าสุวรรณ ประธานเจ้าหน้าที่บริหาร (คนที่ 2 จากทางขวา) และ นItalthai Engineering Co., Ltd., led by Mr. Sakol Laosuwan, Chief Executive Officer (second from right), and Mr. Chanchai Yutthanarong, Executive Vice President of Power Group (first from left), participated in the groundbreaking ceremony to commence the development of a rooftop and ground-mounted solar power generation project at the Saraburi cement plant in Kaeng Khoi District, Saraburi Province. The project is being implemented by Insee B.Grimm Solar Co., Ltd., a joint venture between the Siam City Cement Group and B.Grimm Power.
This solar power project is one of the largest solar energy projects in Thailand, with a total production capacity of 84 MW, comprising:
- Ground-mounted solar panels: Installed in three areas, with a combined capacity of 76 MW.
- Rooftop solar panels: Installed on four buildings, with a combined capacity of 8 MW.
Role of Italthai Engineering
Italthai Engineering Co., Ltd. has been entrusted to carry out the project on a turnkey basis. The scope of work includes engineering design, procurement of equipment, machinery, and related materials, customs clearance, and transportation of goods. The company is also responsible for construction, installation, system testing, and commissioning (COD), as well as managing all necessary permits and approvals.
Commitment to Clean Energy
Italthai Engineering Co., Ltd. places great importance on environmental conservation and is dedicated to supporting the use of clean, sustainable energy that is friendly to nature. We are proud to be part of this significant project, which fosters the transition to renewable energy in Thailand’s industrial sector. This initiative not only contributes to reducing greenhouse gas emissions but also highlights the shared responsibility of all stakeholders in creating a better world for future generations.