Staff Only

Occupational Health and Safety (OH&S) Management System 

and Environmental Management System

OH&S Policy: “Strict to Safety and Occupational Health Laws and Regulation, Continual improvement of the system, striving towards Zero Accident.”

It is a much for ITE to work and manage Occupational Health and Safety by all application laws and regulations concerning OH&S such as the Safety, Occupational Health, and Working Environment at work Act, the Standard of management for Safety, Occupational Health and Working Environment and all other legislations to achieve our target of “Zero Accident”. Since 2007, ITE has established occupational health and safety OH&S committees and documented OH&S management system in line with the laws and continually improved their effectiveness till now. Our OH&S organization structure including the “Central OH&S Committees, OH&S Central Department, Site Safety Officers and Site OH&S Committees according to the law (as shown in organizational chart below).

Our OH&S documents comprise of

      -Policy and Objective with Key Performance Index and OH&S plans.

      -Manual and Procedures such as inspection of construction machines and equipments, emergency readiness and response, incident reporting, risk identification and assessment, OH&S auditing etc.   

     To assure effectiveness of the system and to achieve the OH&S Objectives, we closely monitor, and audit all the activities concerned at project sites, conduct training, safety talk and promote safety working, together with management monitor through monthly OH&S committee and management review meetings.

    Our OH&S Management System by Laws is the basic minimum requirements of company which every unit has to follow strictly when execution of every project before developing to the international standard in future. 

Occupational Health & Safety (OH&S) Management System (OHSAS 18001: 2007) and Environmental Management System (EMS-ISO14001: 2015) for Construction under Oil & Gas and Petrochemical Environment 

To fulfil the requirements of construction services in Oil & Gas, Petrochemical, mine and large factories which require fast track construction services under restriction and high standard of OH&S and Environmental Management in working, ITE has established special team with well-trained staffs and high standard OH&S and Environment management Systems together with our fabrication work shop and our branch office at Rayong Province to service the market.

This team, called “Project Division’’, is accepted for its performance of good quality fast  track construction works and strictly comply with Oil and Gas and Petrochemical Standard of OH&S and Environment Management Systems which finally  has been certified both OHSAS 18001:2007 and ISO 14001: 2015 by Bureau Veritus since March, 24th 2017 other than QMS-ISO9001:2015 with the following scopes:

‘’Construction of civil, electrical, mechanical, instrument, test & commissioning works for Petrochemical Plant, Oil & Gas Plant, Warehouse, Factory and Office Building’’

Our OHSAS 18001 and EMS – ISO 14001 for working in Oil & Gas and Petrochemical Industry comprise of serial of documents comply with these international standards other than the existing QMS-ISO9001 and OHSAS (by Laws) with the following policies:

 Occupational Health & Safety Policy (OHSAS 18001)

“Strict to Safety and Occupational Health Laws and regulations, Continual improvement of the system, striving towards Zero accident “

Environmental Policy: (ISO 14001)

‘’Fulfil the compliance obligation,

 Prevention of polution,

 Sustainable resource use,

 Preserve the environment mind,

Continual improvement to enhance environmental performance.’’ 

 

 

 

COMPANY DATA


Address

2034/124 Italthai Tower 29th Floor,
New Petchburi Road, Bangkapi,

Huaykwang, Bangkok 10310
Thailand

Telephone

Tel.  (662) 723-4420-5
Fax. (662) 723-4427

E-mail

[email protected]

Website

www.italthaiengineering.com

 

LoGo

Project References

BANG PAKONG HELPER COOLING TOWER
NORTH BANGKOK COMBINED CYCLE POWER PLANT
SOUTH BANGKOK COMBINED CYCLE POWER PLANT
MEA-115-24 KV GIS MINBURI SUBSTATION
SERM SANG PALANG NGAN 40 MW PV. SOLAR PLANT
MEA-115-24 KV GIS BANGPLA SUBSTATION
RAYONG COMBINED CYCLE POWER PLANT
IRPC-WASTEWATER TREATMENT PLANT-CWTP AND PWTU-II
iWIND- PAK PHANANG 10MW WIND FARM PROJECT
SOLARCO SOLAR POWER PROJECT 3X9.5 MW
CHAIYAPHUM WIND FARM PROJECT
YANHEE SOLAR POWER 3 PROJECT
SRI-EIAM AND SRI-WIANG SUBSTATIONS
CHATREE NORTH GOLD PROJECT
OZO SAMUI RESORT
SCG-DOW WASTEWATER TREATMENT PLANT
ITALTHAI TOWER
BANN HOUAYXAI GOLD AND SILVER PROJECT LAOS
NED-LOPBURI AND WANG PLOENG SOLAR PLANTS
ORIENTAL WIRELESS HOTEL AND RESIDENCES
AMARI HUAHIN HOTEL & AMARI RESIDENCE HUAHIN
EGCO-THEPPANA WIND FARM
BAAN THEW TALAY CONDOMINIUM
Copyright © 2013 Italthai Engineering Co.,Ltd. All rights reserved.
2034/124 Italthai Tower 29th Floor, New Petchburi Road, Bangkapi, Huay Kwang, Bangkok 10310 Thailand | Tel. +66(0)2723 4420-5 Fax. +66(0)2723 4427