Staff Only

 

ELECTRICAL EXPERT DIVISION

 

HV/MV ELECTRICAL SYSTEM

● HIGH VOLTAGE SUBSTATION
● SWITCHYARD AND ACCESSORIES
● TRANSMISSION LINE
● PV SOLAR ROOFTOP
● AUXILIARY POWER SUPPLY SYSTEM
● GROUNDING SYSTEM
● LIGHTNING PROTECTION SYSTEM
● CONTROL AND INSTRUMENTATION
● TESTING AND COMMISSIONING
 

SERVICE AND MAINTENANCE

● SWITCHYARD AND ACCESSORIES
● TRANSMISSION LINE AND
UNDERGROUD CABLE

● MAIN DISTRIBUTION BOARD
● SWITCHGEAR / RING MAIN UNIT
● LOW VOLTAGE SWITCHBOARD
● TRANSFORMER
● GENERATOR / FIRE PUMP
● GROUNDING AND LIGHTNING PROTECTION
● PREVENTIVE MAINTENANCE AND
REVAMPING OF RETAIL GAS STATION

 

RENOVATION

● MEDIUM VOLTAGE EQUIPMENT
● LOW VOLTAGE EQUIPMENT
● GROUNDING SYSTEM IMPROVEMENT  

 

POINT OF CONTACT

Electrical System Work and Maintenance Work

Mr.Thongchai  Vijarnjaroen

T  : +66 (0) 2723-4420-5 Ext. 4001

M : +66 (8) 1914-2233

E :  [email protected]

 

 

   
NORTH  BANGKOK  COMBINED  CYCLE  POWER     115/24 kV  SUBSTATION - 55 MW LOPBURI
 PLANT  (EGAT-230 kV SWITCHYARD)     SOLAR PLANT
       

 

 

115/24 kV GAS INSULATED SWITCHGEAR-MEA     115/24 kV GAS INSULATED SWITCHGEAR-MEA 
MINBURI SUBSTATION     BANGPLA SUBSTATION
       

 

 

115/22 kV PEA-KUMPHAWAPI SUBSTATION     RETAIL GAS STATION MAINTENANCE AND 
      REVAMPING 
       
   

PHOTOVOLTAIC SOLAR ROOFTOP 1.0 MW (dc)     SELECTRICAL WORK-TOSHIBA 
      SEMICONDUCTOR (THAILAND)
       

 

LoGo

Project References

BANG PAKONG HELPER COOLING TOWER
NORTH BANGKOK COMBINED CYCLE POWER PLANT
SOUTH BANGKOK COMBINED CYCLE POWER PLANT
MEA-115-24 KV GIS MINBURI SUBSTATION
SERM SANG PALANG NGAN 40 MW PV. SOLAR PLANT
MEA-115-24 KV GIS BANGPLA SUBSTATION
RAYONG COMBINED CYCLE POWER PLANT
IRPC-WASTEWATER TREATMENT PLANT-CWTP AND PWTU-II
iWIND- PAK PHANANG 10MW WIND FARM PROJECT
SOLARCO SOLAR POWER PROJECT 3X9.5 MW
CHAIYAPHUM WIND FARM PROJECT
YANHEE SOLAR POWER 3 PROJECT
SRI-EIAM AND SRI-WIANG SUBSTATIONS
CHATREE NORTH GOLD PROJECT
OZO SAMUI RESORT
SCG-DOW WASTEWATER TREATMENT PLANT
ITALTHAI TOWER
BANN HOUAYXAI GOLD AND SILVER PROJECT LAOS
NED-LOPBURI AND WANG PLOENG SOLAR PLANTS
ORIENTAL WIRELESS HOTEL AND RESIDENCES
AMARI HUAHIN HOTEL & AMARI RESIDENCE HUAHIN
EGCO-THEPPANA WIND FARM
BAAN THEW TALAY CONDOMINIUM
Copyright © 2013 Italthai Engineering Co.,Ltd. All rights reserved.
2034/124 Italthai Tower 29th Floor, New Petchburi Road, Bangkapi, Huay Kwang, Bangkok 10310 Thailand | Tel. +66(0)2723 4420-5 Fax. +66(0)2723 4427