Projectname
Client

Contract Value(MB)

Completion

Date

Scope Of Work
STEAM DISTRIBUTION SYSTEM FOR TLP COGENERATION
TPL COGENERATION CO., LTD.
14.7
25 DEC 2003
DESIGN, SUPPLY, CONSTRUCTION, ERECTION, TEST & COMMISSIONING OF STEAM DISTRIBUTION SYSTEM AND CONDENSATE RETURN SYSTEM FROM TLP COGEN. TO TUNTEX TEXTILE FACTORY (CIVIL, MECHANICAL, ELECTRICAL, CONTROL AND INSTRUMENT)
CIRCULATING WATER MAKEUP SYSTEM FOR KRABI THERMAL PLANT UNIT 1
EGAT
170.8
21 OCT 2001
DESING, SUPPLY CONSTRUCTION, ERECTION, TEST AND COMMISSIONING OF MECHANICAL, ELECTRICAL, CONTROL AND INSTRUMENTATION FOR CIRCULATING WATER MAKE UP SYSTEM. THE SYSTEM CONSIST OF INTAKE STRUCTURE, 2 x 2,300 M3/HR CW MAKE UP PUMPS, DIA. 650 MMX 350 M. LO
STORAGE TANK AND ACCESSORIES FOR KRABI THERMAL POWER PLANT
EGAT
61.3
31 JAN 2000
DESIGN, FABRICATION, SUPPLY, TRANSPORTATION AND SUPERVISION OF STORAGE TANK AND ACCESSOIRES SYSTEM. THE SYSTEM CONSIST OF 4 x 2,000 CUM WATER STORGE TANKS, 1 x 2,000 CUM FUEL OIL STORGE TANK, 2 x 10,000 CUM FUEL OIL STORGE TANK UNLOADING SYSTEM, FIRE PO
HEAT RECOVERY STEAM GENERATOR BLOCK 1 (HRSG 1A &1B) RATCHABURI COMBINED CYCLE POWER PLANT
EGAT
39.0
11 JAN 1999
INSTALLATION & ERECTION OF HEAT RECOVERY STEAM GENERATOR BLOCK 1 (HRSG 1A &1B)
STEAM DISTRIBUTION PIPING SYSTEM FOR AMATA-EGCO
AMATA-EGCO POWER LIMITED
40.5
1 JAN 1999
SUPPLY AND ERECTION OF STEAM DISTRIBUTION PIPING SYSTEM FOR POWER PLANT
HANDRIAL AND TOE PLATE FOR WANG NOI COMBINED CYCLE PLANT STAGE II
MITSUBISHI CORPORATION
1.7
1 JAN 1997
SUPPLY , FABRICATION AND TRANSPORTATION OF HANDRIAL ANDTOEPLATE FOR WANG NOI COMBINED CYCLE PLANT
HANDRIAL & TOE PLATE FOR WANG NOI COMBINED CYCLE PLANT STAGE I
MISUBISHI CORPORATION
3.3
1 MAY 1996
SUPPLY AND FABRICATION OF HANDRAIL & TOE PLATE FOR WNCC I FOR BOILERS (80 TONS)
OIL & WATER STORAGE TANK, NONG CHOK GAS TURBINE POWER PLANT
EGAT
52.1
1 SEP 1995
FABRICATION AND ERECTION OF 2 x OIL STORAGE TANK (10,200 M3), 3 x WTR STORAGE TANK (1,770 M3), INCLUDING PILING & FOUNDATION
GENERAL M & E CONSTRUCTION SOUTH BANGKOK COMBINED CYCLE POWER PLANT BLOCK 1 (325 MW)
EGAT
563.4
1 AUG 1994
CONSTRUCTION & COMMISSIONING FOR 1 x STEAM TURBINE & GENERATOR, 2 x HRSG 2P 80 BAR, PLANT DCIS HV - LV ELECTRICAL, FURNISH & INSTALL ALL MECHANICAL, ELECTRICAL CABLES, RACEWAY & INSTRUMENTATION
GENERAL M & E CONSTRUCTION RAYONG COMBINED CYCLE POWER PLANT BLOCK 4 (300 MW)
EGAT
510.0
1 JAN 1993
CONSTRUCTION & COMMISSIONING FOR 1 x STEAM TURBINE & GENERATOR, 2 x HRSG. 2P 80 BAR, PLANT DCIS HV-LV ELECTRICAL, FURNISH & INSTALL ALL MECHANICAL BOP, ELECTRICAL CABLES, RACEWAY & INSTRUMENTATION


 

 
 
TC