Projectname |
Client |
Contract Value(MB) |
Completion
Date |
Scope Of Work |
CONSTRUCTION OF 115 KV UNDERGROUND CABLE BETWEEN RAYONG 2 SUBSTATION OF PEA AND EGAT |
PEA |
38.5 |
30 MAR 2005 |
DESIGN, SUPPLY, CONSTRUCTION, INSTALLATION, TESTING AND PROJECT MANAGEMENT OF 115 KV XLPE. UNDER GROUND CABLE ALONG THE RIGHT OF WAY OF THE HIGH WAY INCLUDED DUCTBANK , MANHOLE ,RISER AND CABLE PULLING |
RENOVATION OF SUBSTATION EQUIPMENTS FOR FANG SUBSTATION-MAE KUEMLUANG FANG CHIANGMAI HYDROELECTRIC POWER PROJECT |
DEPARTMENT OF ALTERNATIVE ENERGY DEVELOPMENT AND EFFICIENCY (DEDE) |
0.7 |
24 MAR 2005 |
SUPPLY, INSTALLATION, OVERHAUL, PREVENTIVE MAINTENANCE AND TESTING FOR RENOVATION OF 22 KV OUTDOOR SUBSTATION |
69/12-24 KV GIS SUBSTATION FOR KING MONGKUT INSTITUTE OF TECHNOLOGY NORTH BANGKOK-NONTHABURI CAMPUS |
KING MONGKUT INSTITUTE OF TECHNOLOGY NORTH BANGKOK (KMIT-NB) |
79.3 |
11 MAR 2005 |
DESIGN, SUPPLY, CONSTRUCTION INSTALLATION, TESTING - COMMISSIONING AND PROJECT MANAGEMENT FOR 69/12-24 KV 25 MVA GAS INSULATED SWITCHGEAR SUBSTATION INCLUDED ALL 24 KV UNDERGROUND CABLE AND SWITCHGEARS FOR DISTRIBUTION SYSTEM WITHIN THE CAMPUS |
115/6.6 KV GIS SUBSTATION FOR THAI PRIDE CEMENT PLANT |
THAI PRIDE CEMENT CO., LTD. |
20.5 |
10 MAR 2005 |
DESIGN, SUPPLY, CONSTRUCTION, INSTALLATION, TESTING - COMMISSIONING AND PROJECT MANAGEMENT FOR 115/6.6 KV 30 MVA GAS INSULATED SWITCHGEAR SUBSTATION OF CEMENT PLANT |
12 KV TO 24 KV - VOLTAGE CONVERSION FOR MEA
1. KODAK BUILDING
2. THE GOVERNMENT SAVINGS BANK BUILDING BUILDING 1
3. THE GOVERNMENT SAVINGS BANK BUILDING 2
4. DEPARTMENT OF MEDICAL SCIENCES
5. AMARI AIRPORT |
MEA |
11.3 |
15 JAN 2005 | DESIGN SUPPLY, INSTALLATION AND TESTING FOR REPLACEMENT OF 12 KV EQUIPMENTS WITH NEW 24 KV EQUIPMENTS INCLUDED 24 KV SWITCHGEARS, POWER TRANSFORMERS AND UNDERGROUND CABLE |
12 KV TO 24 KV - VOLTAGE CONVERSION FOR MEA
1. RUAMJAI-HEIGHTS BUILDING
2. RAJAPARK BUILDING
3. NIDA MANSION BUILDING
4. CASTLC HILL MANSION CONDOMINIUM
5. PRESTIGC 49 CONDOMINIUM |
MEA |
10.8 |
8 DEC 2004 |
DESIGN SUPPLY, INSTALLATION AND TESTING FOR REPLACEMENT OF 12 KV EQUIPMENTS WITH NEW 24 KV EQUIPMENTS INCLUDED 24 KV SWITCHGEARS, POWER TRANSFORMERS AND UNDERGROUND CABLE |
SUPPLY AND INSTALLATION OF 115/22 KV. SUBSTATION FOR THAI HITACHI ENAMEL WIRE FACTORY |
THAI HITACHI ENAMEL WIRE CO., LTD. |
5.1 |
24 AUG 2004 |
DESIGN, SUPPLY ,INSTALLATION AND TESTING-COMMISIONING FOR 115/22 KV. POWER SUBSTATION RENOVATION PROJECT |
115/22 KV SUBSTATION RECOVERY |
THAI HITACHI ENAMEL WIRE CO., LTD. |
5.0 |
31 JUl 2004 |
SUPPLY, CONSTRUCTION, INSTALLATION, TEST AND COMMISSIONING FOR 115/22 KV TRANSFORMER, 115 KV AND 22 KV SWITCHGEAR |
12 KV TO 24 KV - VOLTAGE CONVERSION FOR MEA
1. M.L. DEVELOPMENT CO., LTD. (PETER A, B, C, BUILDING)
2. ASTA RAMA CO., LTD.
3. LIBERTY PLAZA |
MEA |
11.8 |
25 FEB 2004 |
DESIGN, SUPPLY, INSTALLATION AND TESTING FOR REPLACEMENT OF 12 KV EQUIPMENTS WITH NEW 24 KV EQUIPMENTS INCLUDED 24 KV SWITCHGEARS, POWER TRANSFORMERS AND UNDERGROUND CABLE |
22 KV SWITCHYARD RENOVATION FOR HUAY NAM KOON CHIANGRAI HYDROELECTRIC POWER PROJECT |
DEPARTMENT OF ALTERNATIVE EMERGY DEVELOPMENT AND EFFICIENCY (DEDE) |
1.2 |
15 JUL 200 |
SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF 22 KV OUTDOOR SWITCHYARD OF HYDROELECTRIC POWER PLANT |